How RNA Companies Can Build Validation Readiness Before Scale-Up
By Jason Herche, VP, Digital Validation & AI Solutions, Pinnaql

RNA therapeutics have shown what the science can do. For a small or midsize company moving an mRNA, small interfering RNA (siRNA), or antisense program from pre-IND toward a marketing application (an NDA or a biologics license application, depending on modality), the harder question is often operational: Can you show, with documented evidence, that your equipment, systems, and process do what you say they do, every time?
That is what a validated state means. It does not appear when you sign a CDMO agreement, and it does not require you to hire a full validation department before your first GMP batch. In many of the programs I have seen, the companies that scale most smoothly are not necessarily the ones with the largest teams; they are the ones that decide early how they will reach a validated state.
What "Validated" Actually Requires
The expectations are well established, even if they feel scattered across guidances and annexes. Equipment and facility qualification still rests on commissioning plus installation, operational, and performance qualification (IQ/OQ/PQ) for the equipment and utilities that touch product or data; in the EU, Annex 15 sets out expectations for qualification and validation. Computerized system validation and data integrity sit alongside that work: 21 CFR Part 11 for electronic records and signatures in the U.S., EU GMP Annex 11 for computerized systems (currently being revised), and ALCOA+ principles for the data itself. Process validation is a life cycle, not a one-time run of three batches; the FDA's 2011 process validation guidance describes three stages: process design, process qualification, and continued process verification. For injectable RNA products, the revised EU GMP Annex 1 (published 2022, in effect since August 2023) expects a documented contamination control strategy spanning facility, equipment, materials, and people.
Threaded through all of this is risk-based thinking. ICH Q9(R1) on quality risk management, ICH Q10 on the pharmaceutical quality system, and the International Society for Pharmaceutical Engineering's GAMP 5 Second Edition all point toward concentrating validation effort where the risk to patient safety, product quality, and data integrity is highest. The FDA's final Computer Software Assurance (CSA) guidance makes the same point; it was written for medical device production and quality system software, but its principles are widely applied in pharma.
Expectations also scale with phase. The FDA's 2008 guidance on cGMP for Phase 1 investigational drugs recognizes that most Phase 1 material is exempt from 21 CFR Part 211 but must still be made under controls appropriate to that stage. Part 211 applies from Phase 2 onward, and the FDA's 2011 guidance expects process performance qualification to be successfully completed before commercial distribution. That phased reality is an opportunity: You can build the foundation now without building everything at once.
Look Beyond The Full Department
Many early-stage teams assume the only route to a validated state is a fully staffed in-house validation group, with engineers, computerized system validation specialists, and document control. For a company with one or two clinical programs, that group can be slow to recruit, expensive to carry between campaigns, and hard to keep busy. Other models exist, and they can be combined.
A fractional or outsourced validation function lets experienced validation professionals plan, author, and execute qualification and validation work under your quality system, scaling up for a facility startup or tech transfer and down between campaigns. Digital, or paperless, validation platforms for authoring, routing, executing, and approving protocols can replace paper binders, enforce review workflows, and keep a traceable audit trail. Neither the FDA nor EU GMP requires a digital approach, and a well-run paper system can be compliant; ALCOA+ applies either way. What a digital platform offers is a more consistent way to meet those expectations as programs and sites multiply. Choose tools proportionate to your organization's size, and remember that the platform itself must be validated for its intended use. Risk-based scope closes the loop: Applying ICH Q9 and CSA principles means critical systems get rigorous scripted testing, while lower-risk functions can lean on supplier documentation and unscripted or exploratory testing. The goal is less paper, not less control.
What You Keep, And What You Can Share
Whatever the model, one thing does not move. Under 21 CFR 211.22, the quality control unit has the responsibility and authority to approve or reject components, in-process materials, and drug products, including those made under contract by another company, and to approve the procedures and specifications that affect product quality. A partner can do a great deal of the work; it cannot own your quality decisions.
What stays in-house is the decision layer: approval of the validation master plan, protocols, deviations, and final reports; ownership of risk assessments and acceptance criteria; supplier and CDMO qualification decisions, along with the quality agreements that define responsibilities; and change control, including the final decision that a system or process is fit for use. An experienced partner, working under your procedures and approval, can carry much of the execution. That includes validation planning and drafting user requirements; authoring and executing protocols for equipment, utilities, and computerized systems; and preparing traceability matrices, summary reports, and periodic reviews. A partner can also set up and administer a digital validation platform and train your staff so the knowledge stays with your company.
Before you scale, it helps to know whether you can answer a short set of readiness questions with a defensible yes:
- Is there an approved validation master plan that reflects your phase, your sites, and your CDMO relationships?
- Has every GMP system been inventoried and assessed for GxP impact and risk?
- Do critical equipment and utilities have user requirements that trace to qualification tests?
- Are lab and manufacturing computerized systems configured with audit trails, unique user access, and secure data retention?
- Are analytical methods qualified for the current phase, with a plan to validate them before pivotal and commercial use?
- Do your quality agreements spell out who validates what, and who approves it?
- Will your change control process hold up when the process, scale, or site changes?
If several of those answers are soft, the gap is the plan — not necessarily headcount.
Avoiding Pitfalls Particular To RNA
RNA programs tend to surface the same validation gaps late, when they are expensive to fix. Cold chain is one of them. mRNA drug substance and drug product often require frozen or ultra-low temperature storage, yet temperature mapping, alarm verification, monitoring system validation, and documented excursion handling can be left until late. Treat freezers and shippers as qualified equipment, not appliances.
Several of my examples that follow apply mainly to mRNA and lipid nanoparticle (LNP) formulations. Chemically synthesized antisense and siRNA programs share the data integrity, single-use, and tech transfer points, but add equipment of their own, such as oligonucleotide synthesis and purification systems.
Another example is LNP mixing equipment. Microfluidic and impingement jet mixers sit at the heart of LNP formulation, and their settings — total flow rate, flow rate ratio, and temperature — are often critical process parameters. Qualify the equipment and its control software, define those parameters in SOPs and batch records, and make sure the data it generates are captured and retained rather than left on a local PC.
Single-use systems shift the work rather than erase it. Bags, tubing, and connectors reduce the cleaning validation burden but move effort to supplier qualification, extractables and leachables assessment, and integrity testing.
Analytical methods are another moving target: Assays for RNA integrity, capping efficiency, encapsulation efficiency, particle size, potency, and impurities such as residual double-stranded RNA (dsRNA) often change with the program. Phase-appropriate qualification is reasonable; undocumented method changes are not.
Tech transfer to a CDMO without aligned requirements, risk assessments, and acceptance criteria invites repeat work, so agree up front whose validation package will be used and how your quality unit will review and approve it.
Finally, lab data integrity remains a familiar source of observations. Stand-alone instruments such as chromatography systems, plate readers, and particle sizers — with shared logins, disabled audit trails, or local data storage — should be fixed in configuration before GMP release testing, not afterward.
If you bring in outside help, evaluate the partner the same way you would evaluate any other quality-critical supplier:
- Have they qualified systems like yours, such as LNP formulation, aseptic fill/finish, cold chain, and lab informatics?
- Will they work within your quality system and SOPs, or impose their own?
- Can they show how their deliverables are risk-based and how they apply CSA principles?
- If they use AI to draft documents, how do they control and review the output?
- How will they transfer knowledge so your team can sustain the validated state?
- Do their tools fit your size and budget, and are those tools validated for intended use?
- Will they confirm in writing that your quality unit retains approval authority?
Be cautious with any provider that promises inspection outcomes or offers to take over quality responsibility. Neither is something a partner can deliver.
Build The Foundation Early
A validated state depends less on the size of your validation team than on the clarity of your plan, the discipline of your quality unit, and the quality of the evidence you generate. RNA companies that make these decisions before scale-up, rather than in the middle of a tech transfer or ahead of a pre-approval inspection, give their science a better chance of reaching patients on schedule. Teams whose validation programs are well organized and standardized tend to absorb schedule changes more easily.
About The Author
Jason Herche is VP, Digital Validation & AI Solutions at Pinnaql, a life sciences engineering and consulting firm. He has more than 20 years of experience in life sciences validation and engineering, most recently as global business process owner for the digital validation platform across Roche Pharma's 28-site network. He holds a bachelor's degree in electrical engineering from Purdue University.